Date-stamp loading
Version status: Inserted | Document consolidation status: Updated to reflect all known changes
Version date: 27 June 2019 - onwards
    Version 1 of 1    

Article 45m Transitional and post-resolution arrangements

1. By way of derogation from Article 45(1), resolution authorities shall determine appropriate transitional periods for institutions or entities referred to in points (b), (c) and (d) of Article 1(1) to comply with the requirements in Articles 45e or 45f or with requirements that result from the application of Article 45b(4), (5) or (7), as appropriate. The deadline for institutions and entities to comply with the requirements in Articles 45e or 45f or the requirements that result from the application of Article 45b(4), (5) or (7) shall be 1 January 2024.

 The resolution authority shall determine intermediate target levels for the requirements in Articles 45e or 45f or for requirements that result from the application of Article 45b(4), (5) or (7), as appropriate, that institutions or entities referred to in points (b), (c) and (d) of Article 1(1) shall comply with at 1 January 2022. The intermediate target levels, as a rule, shall ensure a linear build-up of own funds and eligible li

Comparing proposed amendment...