|
| Responding to this paper |
| 1 Executive Summary |
| 2 Governance arrangements (Article 4 BMR) (paras. 1-22) |
| 2.1 Background and legal basis (paras. 1-8) |
| 2.2 Content of the draft RTS (paras. 9-22) |
| 3 Methodology (Article 12 BMR) (paras. 23-48) |
| 3.1 Background and legal basis (paras. 23-27) |
| 3.2 Content of the draft RTS (paras. 28-48) |
| 4 Reporting of infringements (Article 14 BMR) (paras. 49-92) |
| 4.1 Background and legal basis (paras. 49-61) |
| 4.2 Content of the draft RTS (paras. 62-92) |
| 5 Mandatory administration of a critical benchmark (Article 21 BMR) (paras. 93-108) |
| 5.1 Background and legal basis (paras. 93-99) |
| 5.2 Content of the draft RTS (paras. 100-108) |
| 6 Non-significant benchmarks (Article 26 BMR) (paras. 109-123) |
| 6.1 Background and legal basis (paras. 109-112) |
| 6.2 Content of the draft RTS (paras. 113-123) |
| 7 Annexes |
| 7.1 Annex I - Summary of questions |
| 7.2 Annex II - Draft technical standards |
| 7.2.1 Governance arrangements |
| 7.2.2 Methodology |
| 7.2.3 Reporting of infringements |
| 7.2.4 Mandatory administration of a critical benchmark |
| 7.2.5 Non-significant benchmarks |
| 7.3 Annex III - Preliminary high-level Cost Benefit Analysis |