Skip to main content
Version status: Amended | Document consolidation status: Updated to reflect all known changes
Version date: 1 March 2023 - onwards
Version 3 of 3

Article 18 Recovery and resilience plan

1. A Member State wishing to receive a financial contribution in accordance with Article 12 shall submit to the Commission a recovery and resilience plan as defined in Article 17(1).

2. After the Commission makes available for allocation the amount referred to in Article 12(3), a Member State may update and submit the recovery and resilience plan referred to in paragraph 1 of this Article to take into account the updated maximum financial contribution calculated in accordance with Article 11(2).

3. The recovery and resilience plan presented by the Member State may be submitted in a single integrated document together with the National Reform Programme and shall be officially submitted, as a rule, by 30 April. A draft recovery and resilience plan may be submitted by Member States from 15 October of the preceding year.

4. The recovery and resilience plan shall be duly reasoned and substantiated. It shall in particular set out the following elements: