Regulation 36 Laying of orders
Every order made under Regulation 23 shall be laid before Dáil Éireann as soon as may be after it is made and, if a resolution annulling the order is passed by Dáil Éireann within the next 21 days on which Dáil Éireann has sat after the order is laid before it, the order shall be annulled accordingly, but without prejudice to the validity of anything previously done thereunder.