Date-stamp loading
Version status: Applicable | Document consolidation status: Updated to reflect all known changes
Version date: 1 January 2018 - onwards
  Version 3 of 3    

Article 3 'What are the risks and what could I get in return?' section

1. In the section entitled ‘What are the risks and what could I get in return?’ of the key information document, PRIIP manufacturers shall apply the methodology for the presentation of risk as set out in Annex II, include the technical aspects for the presentation of the summary risk indicator as set out in Annex III and comply with the technical guidance, the formats and the methodology for the presentation of performance scenarios, as set out in Annexes IV and V.

2. In the section entitled ‘What are the risks and what could I get in return?’ of the key information document, PRIIP manufacturers shall include the following:

(a) the level of risk of the PRIIP in the form of a risk class by using a summary risk indicator having a numerical scale from 1 to 7;

(b) an explicit reference to any illiquid PRIIP or PRIIP with materially relevant liquidity risk, as defined in Part 4 of Annex II, in the form of a warning to this effect in the presentation of the summary risk indicator;

(c

Comparing proposed amendment...