Regulations 43, 46, 52, 53, 55
Column 1 |
Column 2 |
---|---|
Description of Equipment |
Period within which or conditions under which testing is required |
After any substantial alteration or repair affecting its strength or stability |
|
Fixed lifting equipment |
Before first use |
Tower crane |
After each assembly |
Mobile crane |
Every 4 years |
Winch |
Every 4 years |
Self erecting crane |
After erection and before first use on site and after any change in configuration or support conditions |
Pulley block, gin wheel or sheer legs or supporting systems for same, used in the raising or lowering of any load weighing 1,000 kg or more |
Before first use |