Article 57 Hospitals and small emitters: failure to notify when ceasing to meet criteria
(1) This article applies where -
(a) either -
(i) a hospital-qualifying installation ceases to be an installation that primarily provides services to a hospital in a scheme year for which the installation is a hospital or small emitter; or
(ii) the reportable emissions of an installation (other than a hospital-qualifying installation) in a scheme year for which the installation is a hospital or small emitter exceed the maximum amount; and
(b) the operator of the installation fails to comply (or to comply on time) with a requirement to give notice on or before 31st March in the following year (the "default year") under a condition of a hospital or small emitter permit included under paragraph 11(3)(a) or (4) of Schedule 7.