Skip to main content
Version status: In force | Document consolidation status: Updated to reflect all known changes
Version date: 12 November 2020 - onwards
Version 2 of 2

Article 58 Installations: failure to apply to surrender permit

The operator of an installation is liable to a civil penalty of £5,000 where the operator fails to apply (or to apply on time) to surrender a permit, contrary to paragraph 11(1) of Schedule 6.