Version 2 of 2

Article 20 Annex 4 amended (parameters for baseline data collection)

(1) Annex 4 is amended as follows.

Section 1 amended (general installation data)

(2) In section 1.4 (eligibility for free allocation) -

(a) in point (b)(i) for "other installations" substitute "a regulated activity";

(b) after point (c) insert -

"(d) Where all the electricity (if any) reported under section 2.5(d) is sold, a statement to that effect or, in any other case, the total amount of electricity produced at the installation sold for consumption outside the installation;

(e) Where electricity was produced at the installation by cogeneration at a cogeneration unit certified under the standard applying from time to time for the purposes of the Combined Heat and Power Quality Assurance Programme:

(i) evidence of the certification;

(ii) the total amount of electricity produced by cogeneration at the unit;

(iii) if the unit produced electricity for consumption at the installation, evidence of this;