Article 30 Schedule 5 amended (Verification Regulation 2018)
(1) Schedule 5 is amended as follows.
Paragraph 54 amended (Annex 1: scope of accreditation for verifiers)
(2) After paragraph 54(b)(ii) insert -
"(iia) after the entry for group 12 (aviation activities) there were inserted -
Activity No | Group | Scopes of accreditation |
---|---|---|
"13 |
| Upstream GHG removal (as defined in paragraph 3(6A) of Schedule 2 to the 2020 Order)"". |