Article 9 Time allocation

1. When determining the time allocation for a verification engagement referred to in Article 8(1)(f), the verifier shall at least take into account:

(a) the complexity of the installation or the aircraft operator's activities and fleet;

(b) the level of information and the complexity of the monitoring plan approved by the competent authority or the monitoring methodology plan, as appropriate;

(c) the required materiality level;

(d) the complexity and completeness of the data flow activities and the control system of the operator or aircraft operator;

(e) the location of information and data related to greenhouse gas emissions or data relevant for free allocation.

2. The verifier shall ensure that the verification contract provides for the possibility for time to be charged in addition to the time agreed in the contract, where such additional time is found to be needed for the strategic analysis, risk analysis or other verification activities. The situations where the additional time may be needed shall include at least the following: