Article 43g Risk analysis

1. The verifier shall identify and analyse the following elements to design, plan and implement an effective verification:

(a) the inherent risks;

(b) the control activities;

(c) where control activities referred to in point (b) have been implemented, the control risks concerning the effectiveness of those control activities.

2. When identifying and analysing the elements referred to in paragraph 1 of this Article, the verifier shall at least consider:

(a) the findings from the strategic analysis referred to in Article 43f(1);

(b) the information referred to in Article 43e and Article 43f(2), point (c);

(c) the materiality level referred to in Article 43f(2), point (b).