Table of Contents
Related
Document Overview
RBC40 Systemically important bank buffers (paras. 40.1-40.23) (effective as of 15 December 2019)
This chapter describes the higher loss absorbency requirements applying to global and domestic systemically important banks.
Version effective as of 15 Dec 2019
First version in the format of the consolidated framework.
Higher loss absorbency requirement for G-SIBs
40.1 The aim of the higher loss absorbency requirement, as set out in the report endorsed by the Group of Twenty at its Seoul Summit in November 2010, is to ensure that global systemically important financial institutions have a higher share of their balance sheets funded by instruments which increase the resilience of the institution as a going-concern. Taking into account this going-concern objective, global systemically important banks (G-SIBs) must meet their higher loss absorbency requirement with Common Equity Tier 1 capital only.
40.2 National supervisors have implemented the higher loss absorbency requirement through an extension of the capital conservation buffer, maintaining the division of the buffer into four bands of equal size (as described in RBC30.17).
40.3 If a G-SIB breaches the higher loss absorbency requirement, it is required to agree a capital remediation plan to return to compliance over a time frame to be established by the supervisor. Until it has completed that plan and returned to compliance, it is subject to the limitations on dividend payout defined by the conservation buffer bands, and to other arrangements as required by the supervisor.