Table of Contents
Commission Delegated Regulation (EU) 2019/331 of 19 December 2018 determining transitional Union-wide rules for harmonised free allocation of emission allowances pursuant to Article 10a of Directive 2003/87/EC of the European Parliament and of the Council (Assimilated Law)RecitalsChapter I General provisions (arts. 1-3a)Article 1 ScopeArticle 2 DefinitionsArticle 2a Eligibility for free allocationArticle 2b Free allocation in 2026-2030 allocation period: applications by incumbent installations that will not produce electricity for sale for consumption outside the installationArticle 2c Meaning of "electricity generator" and "relevant CHP electricity"Article 3 National administrative arrangementsArticle 3a Applications for free allocation under EU ETS to be treated as applications for free allocation in 2021-2025 allocation period by operators of incumbent installationChapter II Application, data reporting and monitoring rules (arts. 4-13)Article 4 Application for free allocation in 2026-2030 allocation period by operators of incumbent installationsArticle 5 Application for free allocation by new entrantsArticle 6 General obligation to monitorArticle 7 Monitoring principlesArticle 8 Content and submission of the monitoring methodology planArticle 9 Changes to the monitoring methodology planArticle 10 Division into sub-installationsArticle 11 Control systemArticle 12 Data gapsArticle 13 Use of electronic templatesChapter III Allocation rules (arts. 14-26)Article 14 National implementation measuresArticle 15 Historical activity level for incumbent installationsArticle 15a Assessment of applications for free allocation by operators of incumbent installationsArticle 16 Preliminary allocation at installation level for incumbent installationsArticle 16a Cross-sectoral correction factorsArticle 16b Final allocation at installation level for incumbent installationsArticle 17 Historical activity level for new entrantsArticle 18 Preliminary allocation to new entrantsArticle 18a Assessment of applications and final allocation at installation level for new entrantsArticle 19 Allocation in respect of steam crackingArticle 20 Allocation in respect of vinyl chloride monomerArticle 21 Heat flows between installationsArticle 22 Exchangeability of fuel and electricityArticle 23 Changes to the allocation of an installationArticle 24 Renunciation of free allocation of allowancesArticle 25 Mergers and splitsArticle 26 Cessation of operations of an installationChapter IV Final provisions (arts. 27-28)Article 27 Repeal of Decision 2011/278/EUArticle 28 Entry into forceAnnex I BenchmarksAnnex II Specific product benchmarksAnnex III Historical activity level for specific benchmarks referred to in Articles 15(8) and 17(1)(f)Annex IV Parameters for baseline data collectionAnnex V Factors applicable for reducing free allocationAnnex VI Minimum content of the monitoring methodology planAnnex VII Data monitoring methodsAnnex VIII BenchmarksDone at
Page Overview
Related
Document Overview
Tools
Print / Export
Notification
Share / Source link
Version status: In force | Document consolidation status: Assimilated law updated to reflect all known changes
Published date: 27 February 2019