Article 2b Free allocation in 2026-2030 allocation period: applications by incumbent installations that will not produce electricity for sale for consumption outside the installation

1. Despite Article 2a(1)(b), an application under Article 4 for free allocation in the 2026-2030 allocation period may be made in respect of an installation that is an electricity generator as if the restriction referred to in Article 2a(1)(b) did not apply, provided that the application is accompanied by a statement by the operator of the installation that the condition in paragraph 2 will be met.

2. The condition is that the installation will not produce any electricity (other than relevant CHP electricity) for sale for consumption outside the installation in the period beginning with the date of the application and ending with 31 December 2030 (the "relevant period").

3. Where such an application is accompanied by the statement referred to in paragraph 1:

(a) the regulator must assess the statement and any evidence provided and include the statement, evidence and regulator's assessment in the information sent to the UK ETS authority under Article 15a(3) for assessment by the UK ETS authority under Article 15a(4);