2.1 In the event of specific circumstances that require prompt action or additional time to complete, the Lead Overseer may, in consultation with relevant competent authorities, reduce or extend the timelines described in Sections 2, 3 and 4 of these Guidelines. The Lead Overseer should document the changes and the reasons for such changes.
Version date: 8 December 2023 - onwards
Version 1 of 1
Guideline 2: Timelines
Closed
4 March 2024