Annex I Minimum content of the monitoring plan (Article 12(1))

Article 12(1).

1. MINIMUM CONTENT OF THE MONITORING PAN FOR INSTALLATIONS

The monitoring plan for an installation shall contain at least the following information:

(1) general information on the installation:

(a) a description of the installation and activities carried out by the installation to be monitored, containing a list of emissions sources and source streams to be monitored for each activity carried out within the installation and meeting the following criteria:

(i) the description must be sufficient for demonstrating that neither data gaps nor double counting of emissions occur;

(ii) a simple diagram of the emission sources, source streams, sampling points and metering equipment must be added where requested by the competent authority or where such diagram simplifies describing the installation or referencing emission sources, source streams, measuring instruments and any other parts of the installation relevant for the monitoring methodology including data flow activities and control activities;

(b) a description of the procedure for managing the assignment of responsibilities for monitoring and reporting within the installation, and for managing the competences of responsible personnel;