653E. Draft map - determinations on exclusions and date.

(1) Where a submission is made in accordance with section 653D by the owner of a site seeking -

(a) the exclusion of a site from a final map, on the basis that the land constituting the site does not satisfy the relevant criteria, or

(b) a change to the date specified in the map as the date on which land constituting a site first satisfied the relevant criteria,

the local authority shall -

(i) evaluate the submission,

(ii) determine whether or not -

(I) the site constitutes land satisfying the relevant criteria, or

(II) the date specified in the map as the date on which the land constituting the site first satisfied the relevant criteria should be changed,

and

(iii) not later than 1 April 2023, notify the owner concerned in writing of its determination.

(2) Before making a determination under subsection (1), a local authority may, where it considers it to be necessary for the purposes of making the determination, within 21 days from the date referred to in 653D(1), request further info