Date-stamp loading
Version status: In force | Document consolidation status: Updated to reflect all known changes
Version date: 21 December 2021 - onwards
    Version 1 of 1    

653G. Supplemental map-submissions.

(1) A person may, not later than 1 June 2023, make a submission on a supplemental map published in accordance with section 653F regarding -

(a) the exclusion from the final map of a site, or

(b) the date on which the land constituting a site first satisfied the relevant criteria,

by sending the submission, together with the person's name and address, to the local authority in writing.

(2) A local authority shall publish, not later than 11 June 2023, on the website maintained by it, the written submissions (other than such elements of a submission which may constitute personal data), if any, received by it in accordance with subsection (1).

(3) Where a submission under subsection (1) is made by the owner of a site, the submission shall be accompanied by a map prepared by Ordnance Survey Ireland at a scale at which the site can be accurately identified.

(4) Where a submission under subsection (1) is made by the owner of the site, that person shall have available such evidence as is neces

Comparing proposed amendment...