Date-stamp loading
Version status: In force | Document consolidation status: Updated to reflect all known changes
Version date: 22 April 2021 - onwards
    Version 1 of 1    

26P. Contract with External Report reviewer.

(1) Where an External Report reviewer is approved or nominated by the Pensions Authority under section 26O, the trustees of the scheme or trust RAC concerned shall enter into a written contract with the External Report reviewer.

(2) It shall be a term of the contract referred to in subsection (1) that -

(a) the External Report reviewer is required to prepare, for the trustees of the scheme or trust RAC concerned, an External Report in accordance with the notice given under section 26N(1) and to provide that External Report to the trustees as soon as practicable after it is completed,

(b) that any duty owed by the External Report reviewer to the trustees concerned which might limit the provision of information or opinion by those trustees to the External Report reviewer in preparing an External Report under this Part shall be waived,

(c) that the External Report reviewer is required and permitted to provide to the Pensions Authority the following where the Pensions Authority so requests

Comparing proposed amendment...